![Bluenose Technologies.PNG](https://static.wixstatic.com/media/b117a1_b015ce00cbdf4e41a001e93661ae8ce8~mv2.png/v1/fill/w_414,h_74,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Bluenose%20Technologies_PNG.png)
Permanent well abandonment plug, using the same formulation as the temporary/drillable plug material.
Designed to be used in concert with a mechanical plug to increase resistance to gas and fluid migration but using increased concentrations of our BN Booster and patented E-Lock to ensure the final reacted product binds to formation and solidifies into a gas and fluid-impermeable barrier.
Unlike other permanent abandonment options, the operator will have the ability to drill through the reacted product.
The system is designed to be able to be pumped through a drilling, coil tubing, or work-over (service) rig pump, as opposed to a dedicated cementing unit (although that is still a viable deployment option). Compressive strength guidelines are still supplied which will determine the exact formulation.
![TerraPlug P.PNG](https://static.wixstatic.com/media/b117a1_5a7d099b0f724bd6b3d5eb45bac4a2c1~mv2.png/v1/fill/w_495,h_327,al_c,lg_1,q_85,enc_auto/TerraPlug%20P_PNG.png)